Capabilities of Alamoot Bridge and Building Engineering Company

45 years of manufacturing experience
Everything as you like

Apart from the specialists it recruits based on the needs of its projects, Alamoot Engineering Company utilizes the services of the following specialized personnel.

Alamoot Company started by constructing high-rise residential and commercial buildings, warehouses, and industrial factories, and then by constructing surface water collection channels and tunnels in Tehran, it gradually specialized in constructing urban and traffic tunnels, water and energy transmission (high-voltage electricity cables), and urban facilities.

Alamoot Company is proud to be the first Iranian private sector company to carry out the construction of mechanized tunnels with TBM-EPB Shield machines in the country. By concluding a contract with Tehran Municipality in 1999, it began the construction of Bahmanyar Tunnel with a TBM machine manufactured by the Canadian company Lovat and successfully completed it on time. The project was inaugurated by the then President as a national project.

By attracting specialized and educated personnel and establishing modern management systems and methods in the execution of work, this company is one of the first contracting companies to receive the Design and Construction Contractor Qualification Certificate from the Management and Planning Organization in 2009. It has completed many of its projects, including Isfahan Metro, Tabriz Metro, and Tabriz Energy Tunnel, in cooperation with foreign and Iranian consultants.

The company’s notable projects in the metro tunnel construction sector are as follows:

The deep tunnels of the southern section of Isfahan Metro Line 1, between Azadi Square and Soffe Terminal, were constructed by the NATM method in the 1980s using 4 Eyckoff and Wirth roadheaders under a design and construction contract.
The deep tunnels of the middle section of Isfahan Metro Line 1, between Shohada Square and Azadi Square, were constructed using two TBMs manufactured by the Hernekenschte Company, under the streets of Isfahan and after passing under the Zayandeh Rood River, the first urban tunnels implemented in the country that have passed several kilometers under groundwater.
The deep tunnels of Tabriz Urban Train Line 1, were constructed using a mechanized method using two TBMs manufactured by the NFM Company, between Daneshgah Square and Laleh Terminal, and under the streets, dilapidated fabric, and the Tabriz Bazaar, most of which are below the groundwater level.

This company has a brilliant track record in all fields of construction, buildings and civil engineering and is proud to have built about 200 kilometers of tunnels with different diameters from 2 to 17 meters across the country, leaving valuable works and relics in the construction of heavy underground buildings and the development and development of the country over the past 40 years. Currently, it is still playing its role in the construction of Line 3 of the Tabriz Metro with two TBM machines manufactured by NFM Company.

Human Resources

Human Resources of Alamut Engineering and Civil Engineering Company, as one of the fundamental pillars of the organization’s success, plays a key role in achieving the company’s goals and vision. By focusing on recruiting, training, and developing expert and experienced human resources, this unit strives to create a dynamic and efficient environment in which employees can use their potential in the best possible way. The company’s approach is based on improving individual and team skills, creating motivation and commitment in employees, and also strengthening an organizational culture based on cooperation and innovation. Alamut Human Resources, by utilizing the best human resource management practices and modern technologies, strives to provide an environment in which employees can provide quality services in the field of engineering and civil engineering with a sense of satisfaction and motivation.

Our machines and equipment

Roadheader

تعداد 4 دستگاه

Jumbo Drill

تعداد 1 دستگاه

بولدوزر

تعداد 4 دستگاه

حفاری روتاری

تعداد 1 دستگاه

گریدر

تعداد 3 دستگاه

لودر

تعداد 10 دستگاه

بیل مکانیکی

تعداد 4 دستگاه

لوکوموتیو

تعداد 3 دستگاه

رولینگ استاک

تعداد 3 ست

تراک میکسر

تعداد 6 دستگاه

کامیون کمپرسی

تعداد 22 دستگاه

تریلی کمرشکن

تعداد 5 دستگاه

پمپ بتن دکل

تعداد 1 دستگاه

پمپ بتن ثابت

تعداد 6 دستگاه

تانکر آبپاش

تعداد 4 دستگاه

غلطک

تعداد 5 دستگاه

دریل واگن

تعداد 2 دستگاه

جرثقیل موبایل

تعداد 10 دستگاه

جرثقیل دروازه ای

تعداد 6 دستگاه

تاور کرین

تعداد 1 دستگاه

کمپرسور هوای فشرده

تعداد 20 دستگاه

ژنراتور

تعداد 20 دستگاه

کمپرسور هوای قابل تنفس

تعداد 1 دستگاه

بچینگ بلانت

تعداد 9 دستگاه

مینی لودر

تعداد 4 دستگاه

لیفت تراک

تعداد 2 دستگاه

تراکتور

تعداد 5 دستگاه

دامپر

تعداد 3 دستگاه